X-Sport Fitness Sport Club 2008

X-Sport Fitness Sport Club 2008 Post-Tensioning Specialties The project consisted in the creation of a Fitness club on 3 levels of an existing retail space. OTB Contracting was hired by the GC to perform Post-Tensioning alterations for the creation of two new...

Council of Foreign Relations 2008

COUNCIL ON FOREIGN RELATIONS Structure Jacking & Load Transfers Concerned by the complexity of the Structural Alteration scheme in the initial design and looking for means to reduce the duration of works the GC contacted OTB Contracting for solutions. The solution...

Campaign for Tobacco Free Kids 2010

Campaign for Tobacco Free Kids 2010 Post-Tensioning Specialties OTB Contracting was selected to perform the Post-tensioning alteration and concrete slab cutting & hauling so to create a new private staiwell connecting the level currently occupied to the lower...

18354 Sharon Rd Repair & Strengthening 2012

18354 Sharon Rd Repair & Strengthening 2012 Concrete Specialties / FRP Strengthening OTB Contracting worked in conjonction with the Owner and the Engineer to develop the most cost effective approach to repair and strengthen a large residance for adults with...

1901 S Bell Street Structural Strengthening 2012

1901 S Bell Street Structural Strengthening 2012 Structural Strengthening / FRP Strengthening OTB Contracting was hired to perform various structural strengthening and alteration works required to accomodate new data and fining rooms in a traditionnally reinforced...